Our Adventures in Madison Wisconsin
September 8th, 2007 at 5:21 pm
Posted by Boone in Condo Stuff

Whew. Our Kitchen project is now done…and it turned out great!

I’ll let the pictures speak for themeslves.

  Before:                   After:
Kitchen BeforeMicrowave Project DoneMicrowave Project Done Close

All-in-all it went pretty smoothly. Jess and I did this ENTIRE project our selfs and took about 5 hours over 2 days to complete. Not too shabby considering the project included cabinet removal & installation, re-routhing wall wiring & electical outlet-box installation, cabinet & wall preportion, along with the wall-mount above-range microwave installation. (Thanks Goehner Designer Builders, all that construction work in high school is really paying off) We were able to do this project for about half of what it would have cost if we’d had to hire the three seperate installers needed.

We love the finished product. If any of you have a similar kitchen or are in a similar “counterspace sitution,” we highly recamend doing this project as well.

Good Luck!